We have been down and sorted the flooring in the conservatory today – typically the one we wanted is no longer available, however, the new selection actually has some better ones – so winner for a change 🙂
Apparently the building of the conservatory should take less than 5 weeks so with a bit of luck we will be enjoying vast new space very soon. The building folks should be contacting us next week to get the ball rolling, and the digging happening 🙂